H2W Blog
Visual guides for people who live on the shop floor
OEE, maintenance, quality and industrial management explained with real numbers, drawings and calculators — based on 20 years of experience in the plants of world leaders.
720 h → 331 h
Visual guide · OEE
What is OEE and how it impacts the final product cost
A month has 720 hours. Your line truly produces in 331. Understand OEE, calculate it in 4 steps, meet the invisible losses and see how much each efficiency point changes cost per ton — with a calculator.
7-min read · Interactive calculator
Read the guide →Coming next
- OEE, PR and reliability: what is the difference
- Why CMMS matters for plant efficiency
- MES software ROI: how to calculate it line by line